"We are at a turning point, moving from relatively high-cost and short mine life operations into a company with foundational assets that can produce over the long-term."

Peter C. Dougherty

PRESIDENT & CEO, ARGONAUT GOLD

December 17, 2020

Can you introduce Argonaut Gold (TSX: AR) and provide an overview of the company’s portfolio of North American assets?

Argonaut Gold is a junior gold producer currently running four operations: three in Mexico, and one in Nevada. We have just launched a development campaign to start our next mine build – the Magino mine in Ontario – which we believe will become the cornerstone asset in our portfolio. Today (October 2020), we sit in a unique position, with assets providing substantial cash flow, generating approximately US$25 million per quarter free cash flow (FCF) going on to the balance sheet. This fuels Argonaut’s organic growth pipeline.

How has the company performed in 2020, and to what extent has Covid-19 impacted your operations?

During the first six months of the year, the three projects that we hold in Mexico generated nearly US$30 million FCF. We acquired the Florida Canyon open-pit heap leach mine in Nevada in July 2020, and expect during the second half of 2020 we will generate US$50 million FCF. The FCF will, in turn, double in 2021, so the US$80 million FCF in 2020 will become north of US$150 million.

Covid has been a great challenge for everybody, but I am happy to say the team has risen up and done a fantastic job. For instance, at our La Colorada facility in Mexico, we are literally 50 meters from the local community. Being that close, you have to form a symbiotic relationship. We took on a cleaning and sanitization program, going into all the homes and washing down the streets, as well as handing out PPE and giving advice on social distancing. Seven months into Covid, and we have only had one case of Covid in the community, which is a testament to the people of La Colorada, and the rigor of our team.

In October 2020, Argonaut’s board of directors approved construction of the Magino mine in Ontario. What attracted you to the asset, and what type of mine will you build?

We searched for three years to find this project, looking for an asset that had the requisite size and mineralization, and importantly for Canada – infrastructure. Magino is a past producer of 100,000 oz as an underground operation, which sits right next door to Alamos Gold’s Island Gold mine. There is already power, water and road access, and the site sits 6 km from rail and 15 km from the town of Dubreuilville. The ore body comes to the surface and is very easy to mine, with the deepest spot of overburden to remove being 3 m. Magino will be an open-pit milling operation with about 20 to 40% of the gold coming through gravity, requiring low cyanide consumption as the ore body is clean.

A feasibility study (FS) was done at the end of 2017, which showed that during the first five years we could produce around 150,000 oz/y at an AISC of US$711. Back then, at a US$1,250 gold environment, this would have equated to a pay back of around three to four years. In today’s market, the pay back drops to under two years, and the previous NPV with a 5% discount of US$290 million rises to almost US$900 million. We will start this project at 10,000 tonnes per day (mt/d), and while we sit with an already-defined endowment of 5.0 million oz, we are also drilling at depth. We see a tremendous opportunity that five years down the road we could be looking at a 20,000 mt/d operation, of which 1,000 mt/d would come from underground, for a LOM of 20 years. Beneath the pit, drilling has showed a 5 to 6-meter wide zone running from 250 m to 900 m down, with an average grade of 6 to 8 g/mt Au.

How are you financing the build, and what is the timeline for development?

The green light has already been given to the financing package for Magino. This will come through Argonaut’s current cash balance that sits at US$180 million, and financing of up to US$175 million by way of a US$50 million bought deal and a revolving credit facility of US$125 million. The FS showed a capex range of between US$360 million and US$380 million, which we have adequately protected.

The Ausenco group out of Australia is partnering with Argonaut to build Magino. The mine will take two years to construct, during which we will do a study to show how we intend to go from 10,000 mt/d to 20,000 mt/d, and will put out a maiden underground mineralized inventory.

In addition to bringing Magino online, what is the company’s growth strategy for the next two years?

We are currently drilling Florida Canyon, looking to complete 10,000 feet in 2020 and at least 50,000 feet in 2021. 2 million oz have already been found, and we see potential to expand this significantly. In January 2021, we will start drilling at the past-producing Standard mine next to Florida Canyon, which could lead to our second mine in Nevada.

Argonaut also has the Cerro Del Gallo development project in Mexico, which we hope to have permitted in the first half of 2021, and we would like to move the construction team that built San Agustin here.

Do you have a final message for the audience of Global Business Reports?

To the Ontario mining community I would say we are excited to join you, and start learning from and creating wealth for our neighbors. For investors, Argonaut Gold has an organic path to become a mid-tier, low-cost producer. We are at a turning point, moving from relatively high-cost and short mine life operations into a company with foundational assets that can produce over the long-term. We have cash flow generation so the risk profile is low, and our current PNAV ratio makes us inexpensive at today’s valuation. Argonaut is led by a management team that has been there and done that multiple times before, and is one of the rising growth companies to invest in.

INTERVIEWS MORE INTERVIEWS

"NORCAT is the only innovation centre in the world that has an operating mine designed to enable start-ups, SMEs, and international companies to develop, test and demonstrate emerging technologies."
"The energy transition can only be funded by big oil, as they are the only players who can balance the low returns of renewables projects with their high earning fossil fuel projects."
"Our commitment to being OEM and technology agnostic sets us apart, enabling collaboration with diverse technologies."
"Wyoming is strategically positioned to address the geopolitical challenges affecting critical minerals, particularly in the uranium sector."

RECENT PUBLICATIONS

Mexico Chemicals 2024

In August 2023, Mexican exports to the US surpassed China for the first time. As companies prioritize securing supply their chains after years of logistics challenges, Mexico has begun to see major benefits. With a spate of new infrastructure projects such as the Interoceanic Corridor of the Isthmus of Tehuantepec coming online in 2023, the country is actively opening itself to investment. The chemical industry, in particular, is positioned for nearshoring-driven growth.

MORE PREVIOUSLY PUBLISHED

MACIG

"We plan to double our copper production by the end of the decade. There remains significant upside potential in the gold industry, and the copper operations are strategic and additive to that."

SUBSCRIBE TO OUR NEWSLETTER